Manunal Oxidation production line with a monthly supply capacity of 900 tons
一.Product Description
1. Oxidating production lines are dedicated to enhancing energy efficiency through the implementation of various energy-saving measures, such as the integration of heat recovery systems, optimization of process parameters, and utilization of cutting-edge energy-efficient equipment.
2. In addition to their focus on energy efficiency, oxidating production lines have established comprehensive waste management strategies to effectively handle the byproducts and waste generated during the anodizing process.
3. Furthermore, oxidating production lines may incorporate advanced automation and robotics technologies in order to elevate both process efficiency and consistency to new heights.
二. Design Condition
1 | Alloy | Aluminium 6061 to 6063 or others |
2 | Anodizing film thinkness | 10~ 12µm m |
3 | Average coverage area | 350m²/T (ton) |
4 | Max aluminium profile length | 6500mm |
5 | Extrusion ratio | 2.5kg/m² |
6 | Working hour/m | 300d/m x 20h/d = 600h/m |
7 | Racking system | Two fixtures /rack |
8 | Racking operation | Manual |
9 | Equipment Usage Rate | 0.9 |
10 | Power supply | AC 3phase 380v 50hz |
11 | Control Power | AC220V 50Hz |
12 | Water supply | 2kg/cm²·G |
13 | Hot steam | 6kg/cm²·G |
14 | Compressor air | 6kg/cm²·G |
三.Process Tank
1 | Degreasing 【Free sulfuric acid 180±30 g/l】 | 1 Tank |
2 | Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 | 2 Tanks |
3 | Neutralization 【Free sulfuric acid180±20g/l】 | 1 Tank |
4 | Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 | 4 Tanks |
5 | Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 | 2 Tanks |
6 | Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 | 3 Tank |
四.Treatment Process:
(6) Average anodizing layer : 0.3*1.3*30*0.77 =10.81um
1) Clour process: Mix Salts
2) Quantity:2 jig(rack)/tank x 1tanks = 2jig(rack)
3) Current density: 70A
4) Process time: 2-8min
6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2) Quantity:6jig(rack)/tank x 1 tank
3) Process time 10-15min
五. Design Parameter and Setting
1. Anodizing treatment area:
1) Each anodizing process tank need 40min ,where total jig(rack)/year:
( 2 rack x 4 tank x 60min/h) ÷40min x600 hour =7200jig(rack)
2) Design 50m²/jig(rack) . Where every tank is 100m²
3) Area treatment/year : 7200jig(rack)x 50m² /jig =360000m²
2. Anodizing treatment weight:
Monthly output : 360000m²÷350m²/T*0.9=925T≧900T
3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank
Power Rectifier : 15000A =4unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank
Colour Rectifier : 8000A =2unit
六. Process Chat
Discription for Un | ||
1 | De | Degreasing |
2 | Rs | Rinsing |
3 | HW Rs | Hot Water Rinsing |
4 | AE | Alkaline Etching |
5 | Ne | Neutralization |
6 | An | Anodizing |
7 | Cl | Coloring |
8 | Sl | Sealing |
9 | MU | Material Unloading |
10 | Pc | Packing |