80 Tons/Month Semi-Automatic Hard Anodizing Line for Black Anodized Aluminum Parts

80 Tons/Month Semi-Automatic Hard Anodizing Line for Black Anodized Aluminum Parts

Brand Name: MEI-AL
Model Number: MEI-AL-EE402
MOQ: I set
Price: Customized Price
Packaging Details: Standard Packaging
Payment Terms: L/C,T/T
Detail Information
Place of Origin:
Foshan, China
Tank Body:
Concrete
Application:
Surface Treatment For Corrosion Resistance And Decoration
Productioncapacity:
Depends On Model, Typically 100-1000 Kg/hour
Operate:
Semiautomatic Or Automatic
Inspection:
Provided On Line
Dimention:
Customizied
Anodizing Tanks:
Customized
Cooling Method:
Water Cooling
Heating Way:
Steam,Electricity
Highlight:

80 Tons/Month Capacity Hard Anodizing Line

,

Semi-Automatic Operation Anodizing Production Line

,

Black Anodized Finish Surface Treatment Line

Product Description
80 Tons/Month Semi-Automatic Hard Anodizing Line for Black Anodized Aluminum Parts
Overview

This semi-automatic hard anodizing production line is engineered for medium-volume surface finishing of aluminum components requiring exceptional surface hardness, wear resistance, and a matte black finish. With a monthly capacity of 80 tons, the integrated wet processing line combines chemical degreasing, acid neutralization, low-temperature Type III hard anodizing, organic black dyeing, and mid-temperature sealing.

Mechanical sandblasting is performed off-line using customer-supplied equipment prior to racking. By eliminating chemical alkaline etching, the system reduces wet tank chemical consumption and sludge generation while leveraging mechanical sandblasting to achieve the targeted surface roughness and matte appearance.

Technical Specifications
ParameterSpecification
Applicable WorkpiecesPre-sandblasted industrial aluminum components, machinery parts, optical housings, automotive fittings, hardware
Operation ModeSemi-automatic (Electric hoist with manual control & automated process timers)
Anodizing TypeType III Hard Anodizing (Sulfuric Acid Electrolyte)
Film Thickness25 - 50 μm
Surface FinishSandblasted Matte Black / Satin Black (Organic Black Dye)
Process Temperature-5°C - 5°C (Hard Anodizing Bath); 50°C - 60°C (Black Dye Tank); 60°C - 95°C (Sealing Tank)
Current Density2.0 - 4.0 A/dm²
Production Capacity80 Tons / Month
Sealing MethodMid-Temperature Nickel-Free Sealing / Hot Deionized Water Sealing
Anodizing Process Flow
Customer Mechanical Sandblasting (Off-Line) → Racking / Loading → Chemical Degreasing → Water Rinse → Acid Neutralization (Desmutting) → Deionized Water Rinse → Low-Temperature Hard Anodizing (Type III) → Multi-Stage Deionized Water Rinse → Organic Black Dyeing → Deionized Water Rinse → Mid-Temperature Sealing → Hot Water Rinse → Drying → Unloading
Key Features
  • Controlled Film Thickness: High-voltage DC power rectifiers feature soft-start current ramping and automatic voltage adjustment to control oxide layer growth rates and prevent component burning during high-current-density hard anodizing.
  • Automated Process Control: Tanks are configured with digital temperature controllers, automated bath replenishment connections, and countdown timers with audible alarms to assist operators during transfer cycles.
  • Batch Color Uniformity: The organic black dye tank includes continuous fluid circulation, electric immersion heaters, and digital temperature control to maintain uniform dye absorption across sandblasted surface textures.
  • Temperature & Filtration Control: Industrial screw chillers connected to titanium plate heat exchangers absorb heat generated during hard anodizing, holding bath temperatures within -5°C to 5°C. Continuous cartridge filtration removes suspended particulates from the acid bath.
  • Streamlined Pre-Treatment Layout: By replacing chemical alkaline etching with mechanical sandblasting, the wet line footprint is reduced. The subsequent acid neutralization step removes residual blasting dust and native oxides without modifying the mechanically prepared surface texture.
Production Line Configuration
  • Electric Bridge Hoist System: Overhead motorized cranes with variable speed controls, dual-hook lifting bars, and manual push-button pendants for tank-to-tank rack movement.
  • Hard Anodizing Rectifier Units: High-voltage DC power supplies equipped with current density regulation, ripple control, and automatic voltage ramping programs.
  • Low-Temperature Chilling System: Industrial refrigeration units paired with corrosion-resistant titanium heat exchangers and circulation pumps for continuous bath cooling.
  • Exhaust & Acid Mist Scrubber System: Lateral slot extraction hoods, UPVC exhaust piping, and packed-bed scrubber towers for acid gas neutralization.
  • Black Dyeing Tank Equipment: 316L stainless steel dye tanks equipped with electric heating elements, air agitation, and temperature controllers.
  • Bath Filtration & Circulation Modules: Acid-resistant magnetic pumps, UPVC pipe networks, and PP cartridge filter units for continuous electrolyte circulation.
  • Reverse Osmosis (RO) Water System: Multi-stage RO purification unit producing deionized water for post-anodizing rinsing steps and bath make-up.
  • Wastewater Treatment System: Neutralization tanks, chemical dosing units, and filter presses for acid/alkali wastewater treatment prior to discharge.
Frequently Asked Questions
Why is chemical alkaline etching omitted from this line configuration?

The customer utilizes standalone mechanical sandblasting machinery prior to the anodizing stage. Sandblasting provides the required matte surface texture, eliminating the need for chemical etching tanks, reducing chemical usage, and simplifying wastewater treatment.

Is desmutting (acid neutralization) still required after mechanical sandblasting?

Yes. The acid neutralization step removes native aluminum oxides, trace alloy smuts, and fine blasting dust left on the surface, ensuring clean metallic contact prior to hard anodizing.

Which aluminum alloys are suitable for hard anodizing and black dyeing on this line?

Wrought alloys such as 6061, 7075, and 2024, as well as select cast aluminum alloys, can be processed. Alloys with high copper content may require adjusted current density ramping during processing.

How does the system manage bath temperature during high-current hard anodizing?

An industrial screw chiller combined with a titanium heat exchanger and heavy-duty recirculation pumps continuously removes heat generated by high current densities during Type III anodizing.

What is the typical process time for achieving a 50 μm hard anodized coating?

Depending on alloy composition and current density parameters, building a 50 μm oxide layer under Type III hard anodizing conditions typically requires 40 to 60 minutes of bath immersion time.

Customized Anodizing Line Solution

Get a Customized Aluminum Anodizing Line Layout and Process Solution

We provide engineering design, tank sizing, plant layout planning, and equipment integration tailored to your factory layout and production targets. Contact our engineering team to discuss your project specifications.